SITE DEVELOPMENT REQUIREMENTS
Other links in the Interactive Local Plan:
BARDNEY
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
B1
Horncastle Road |
4.73 |
96 |
1. Tree planting to west
and southern boundaries of the site.
2. Protection of view of St Lawrence’s Church.
3. Highway access to be limited to one estate road
junction on to Horncastle Road preferably at the north
eastern end of the site.
4. Highway improvement works. |
B4
Field Lane |
0.56 |
12 |
1. Archaeological site
investigation prior to development of the site.
2. Highway improvement works. |
B5
Wragby Road |
2.00 |
40 |
1. Highway improvement
works.
2. Significant landscaping to northern and eastern
boundaries.
3. Access to be taken directly from Wragby Road. |
B6
Field Lane |
0.78 |
20 |
1. Highway improvement
works. |
B7
Wragby Road |
0.58 |
12 |
1. Highway improvement
works.
2. Cessation of all existing activities on site
prior to the start of development. |
B8
Abbey Road |
1.48 |
30 |
1. Highway improvement
works.
2. Cessation of all existing activities on site
prior to the start of development. |
B9
Station Road |
0.19 |
6 |
1. Highway improvement
works.
2. Cessation of all activities on site prior to
commencement of development.
3. Landscaping to be provided on the southern and
western boundaries. |
B10
Station Road |
1.55 |
30 |
1. Highway improvement
works.
2. Cessation of all activities on site prior to
commencement of development.
3. Suitable landscaping scheme to be provided on
site boundaries
4. A site specific flood risk assessment needs
to be undertaken on this site as part of any submission
of a planning application. |
B(E)1
Henry Lane |
0.80 |
n/a |
1. B1/B2/B8 uses.
2. Provision of landscaping to the west and east
of the site.
3. Highway improvement works. |
Longer Term Development Option |
14.66 |
To be agreed within appraisal |
1. Development appraisal to include
the demolition requirements; contaminated land issues
and consideration of potential for mixed uses and their
type, size and scale. |
BISHOP NORTON
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
BN1
Archer Street |
0.53 |
8 |
1. Nearby livestock units
to cease operation prior to the commencement of development
on site.
2. Design, layout and materials of development
to be in keeping with traditional farm buildings where
practicable.
3. Conversion and re-use of traditional farm buildings
where practicable.
4. Infrastructure improvements including the improvement
of existing roads. |
BN2
Archer Street |
0.51 |
4 |
1. Nearby livestock units
to cease operation prior to the commencement of development
on site.
2. Design, layout and materials of development
to be in keeping with traditional farm buildings where
practicable.
3. Conversion and re-use of traditional farm buildings
where practicable.
4. Infrastructure improvements including the improvement
of existing roads. |
BN3
Archer Street |
0.19 |
4 |
1. Nearby livestock unit
to cease operation prior to the commencement of development
on site.
2. Design, layout and materials of development
to be in keeping with traditional farm buildings.
3. Conversion and re-use of traditional farm buildings
where practicable.
4. Infrastructure improvements including the improvement
of existing roads. |
BN5
Pingle Lane |
0.37 |
4 |
1. Design, layout and materials
of development to be in keeping with traditional, older
village buildings.
2. Landscaping on the eastern boundary.
3. Infrastructure improvements including the improvement
of existing roads. |
BN6
Pingle Lane |
0.36 |
5 |
1. Design, layout and materials
of development to be in keeping with traditional, older
village buildings.
2. Conversion and re-use of traditional farm buildings.
3. Landscaping on the eastern boundary.
4. Infrastructure improvements including the improvement
of existing roads. |
BLYTON
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Bt(E)1
Station Road |
0.43 |
n/a |
1. B1, B2 and B8 uses.
2. Rural workshops to be provided either through redevelopment or new development.
3. Landscaping to north and east site boundaries to safeguard the amenity of adjoining dwellings.
4. Access improvements required. |
BROOKENBY
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Bk8
Lincoln Road |
0.13 |
3 |
1. Consideration to be given to the provision
of a suitable boundary treatment to ensure that the amenities
of the occupiers of existing neighbouring properties are
unaffected by the development of the site. |
Bk(E)1
Technical Park |
11.80 |
n/a |
1. B1, B2 and B8 uses.
2. Retention and creation of tree belts/open spaces to separate development into smaller blocks.
3. Landscape buffer to be created between site and residential areas.
4. Conversion and adaptation of existing site buildings will be considered, however the proposed use will need to accord with Local Plan policies and the position of the building within the AONB.
5. Infrastructure improvements. |
Bk(M)1
Officers Mess |
2.42 |
15 |
1. Low density housing (15 dwellings) around village green/open area.
2. Demolition of Officers Mess building prior to the commencement of development.
3. Housing development to be of single plot depth only along the northern and eastern boundaries, reflecting the character of the nearby housing. |
Bk(M)4
Community Centre |
1.72 |
n/a |
1. A1, A2, A3, D1, D2 uses and community uses. |
BURTON WATERS
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
BW(M)1
Southern site |
31.0 |
350 |
1. Marina and associated housing (350 dwellings). Commercial and leisure uses.
2. All development to follow the concept of an urban design led high quality environment.
3. Care to be taken to ensure that long range views of Lincoln Cathedral through the site are protected. |
BW(M)2
North Eastern site |
6.50 |
n/a |
1. Fishing Lake and associated leisure uses.
2. All development to follow the concept of an urban design led high quality environment.
3. Care to be taken to ensure that long range views of Lincoln Cathedral through the site are protected. |
BW(M)3
North Western site |
15.25 |
n/a |
1. Water sports and fishing lakes and associated commercial leisure facilities.
2. Touring, camping and caravans, chalets and a hotel.
3. All development to follow the concept of an urban design led high quality environment.
4. Care to be taken to ensure that long range views of Lincoln Cathedral through the site are protected.
5. Landscaping buffer to be provided along the A57 boundary. |
CAISTOR
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
C7
Navigation Lane |
6.30 |
176 |
1. Traffic calming measures
along Navigation Lane which shall be the access for the
development, and highway improvement works.
2. Consideration to be given to the design of new
roads to reduce vehicle speeds.
3. Retention of existing site features, trees/hedgerows,
enhancement of watercourse as an amenity feature to be
considered.
4. Substantial landscape planting along the western
and southern site boundaries.
5. Infrastructure improvements. |
C9
Grimsby Road |
0.41 |
9 |
1. Consideration to be given
to the type and style of boundary treatment to the frontage
of the site (northern elevation).
2. Provision of landscaping to the western, eastern
and southern elevation of the site to ensure that the
amenities of nearby occupiers are maintained.
3. Single access to the site.
4. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to development commencing. |
C10
High Street |
0.14 |
5 |
1. Consideration given to
the style and design of the properties to ensure that
they are in keeping with the vernacular of the area using
the conversion of existing buildings where practicable.
2. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to development commencing. |
C12
Grimsby Road |
0.03 |
1 |
1. Provision of a suitable scheme
of landscaping. |
C13
South Street |
0.07 |
3 |
1. Provision of a suitable scheme
of landscaping. |
C14
North Street |
0.10 |
4 |
1. Provision of a suitable scheme
of landscaping. |
C15
Wold View |
0.26 |
7 |
1. Provision of a suitable scheme
of landscaping. |
C16
Caistor Hospital |
5.51 |
130 |
1. There must be careful consideration
of an appropriate design for an important gateway into
Caistor.
2. Appropriate landscaping scheme to be provided
on all site boundaries.
3. The layout will need to consider the sensitive
treatment of the areas of the site which cannot be developed.
4. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing. |
C(E)3
North Kelsey Road |
11.00 |
n/a |
1. B1, B2, B8 and A2 uses.
2. Substantial landscape treatment along all site
boundaries.
3. Infrastructure improvements.
4. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing. |
CHERRY WILLINGHAM
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
CW1
Land off Jubilee Close |
3.64 |
95 |
1. Provision of landscaping/buffer zone adjacent to the railway line to the south of the site. |
CW2
High Street |
0.29 |
10 |
1. Consideration given to the provision of screen planting/landscaping on the eastern boundary of the site to reduce the impact of the proposal on the amenities of neighbouring occupiers.
2. Provision of a suitable boundary to the southern and western elevation. |
DUNHOLME
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
D2a
Land adjacent to A46 by-pass |
0.23 |
9 |
1. Use of noise barrier adjacent to by-pass.
2. Archaeological site investigation prior to development. |
D3
Four Seasons |
1.15 |
26 |
1. Infrastructure improvements.
2. Landscaping to be provided on the boundary to the A46 by-pass. |
FALDINGWORTH
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Fa2
Lincoln Road |
4.61 |
38 |
1. Trees, hedgerows and ponds to be retained on site where possible.
2. Footpath links shall be created between the site and the Village Hall, and High Street.
3. Archaeological site investigation prior to the commencement of any development on site.
4. Possible retention/conversion of buildings situated at the north end of the site.
5. Tree and shrub planted buffer zone to be provided along the eastern side of the site. |
FENTON
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Fe1
Maltkiln Road |
0.76 |
15 |
1. Use of existing access to ‘˜The Old Stack Yard’ for as many dwellings as possible. All access to be off Maltkiln Road.
2. Improvements to Maltkiln Road and traffic calming measures. Junction of the Maltkiln Road and A156 to be improved prior to the occupation of any dwelling.
3. Retention of hedgerows and the provision of landscaping to the south and west edge of the site to improve the visual appearance of development and to reduce visual and noise intrusion from traffic on the A156.
4. Landscaping on the southern boundary to screen the development from the adjoining pumping station.
5. Infrastructure improvements. |
FILLINGHAM
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Fi1
High Street |
1.05 |
15 |
1. Single access to be gained from north of the site.
2. Area between High Street and the site to be created into a village green around which development is to be focussed.
3. Existing agricultural activity on site to cease prior to development occurring on site. All agricultural buildings to be removed.
4. Substantial new landscaping to southern and western site boundaries.
5. Careful consideration of design, materials and siting to reflect sensitive village edge location and conservation area status of part of the site.
6. Consideration to be given to the design of roads on site to reduce vehicle speeds. |
FISKERTON
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
F1
Chapel Road |
1.50 |
35 |
1. Development of the site should avoid overlooking of properties on Chapel Road. This may necessitate the provision of bungalows on some of the site and/or landscaping.
2. Archaeological site investigation prior to the commencement of development.
3. Prior to development the ability of the surface water drainage system to accept additional flows should be investigated. If capacity is insufficient then on site water attenuation measures will be necessary. |
F2
Ferns Road |
0.39 |
6 |
1. The existing pond shall be retained.
2. Frontage development only. |
GAINSBOROUGH
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
G1
The Avenue |
8.11 |
240 |
1. Principal access from
‘˜The Avenue’ frontage, also Milton Road as a possible
cul de sac. No residential vehicular access from ‘˜The
Belt’.
2. Consideration to be given to the design of the
roads to reduce vehicle speeds.
3. Infrastructure improvements.
4. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing.
5. A development appraisal will need to be undertaken
to consider both the transition of the built development
from urban to open countryside and the transition in density
across the site. |
G3
Woodhill Avenue |
6.81 |
200 |
1. Consideration to be given to
the design of the roads to reduce vehicle speeds.
2. Infrastructure improvements.
3. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing.
4. A development appraisal will need to be undertaken
to consider both the transition of the built development
from urban to open countryside and the transition in density
across the site. |
G7
Greystones Road |
1.06 |
40 |
1. Access from Greystones Road frontage.
2. Infrastructure improvements. |
G8
Japan Road |
9.5 |
366 |
1. Access from extension to Japan
Rd.
2. Infrastructure improvements.
3. The existing site to be demolished prior to
the commencement of development.
4. High quality development to be located on the
river frontage to take advantage of the location.
5. Riverside walkway to be created.
6. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing.
7. The existing woodland area on site shall be
retained subject to a detailed assessment to establish
the condition and long term future of the woodland stock
and the results to be incorporated into the overall masterplan
for the site.
8. The developer will be required to carry out
an assessment of flood defences to ensure that these are
to the 1:200 year standard for the lifetime of the development
(50 years). Any necessary improvements and maintenance
to be provided by the developer. The Flood Risk
Assessment to determine the extent and nature of residential
development. |
G10
Lea Road |
1.01 |
30 |
1. Access to be achieved from the
north of the site. No additional new access points on
to Lea Road or Foxby Hill frontage to serve this site.
2. Existing site hedgerows/trees to be incorporated
into the development.
3. Hillside to be kept clear of buildings. |
G11
Foxby Lane |
5.66 |
170 |
1. Principal site access from Park
Springs Road.
2. Consideration to be given to the design of roads
to reduce vehicle speeds.
3. Infrastructure improvements.
4. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing. |
G17
Cecil Street |
0.07 |
3 |
1. Consideration to be given to
boundary treatments to ensure that the amenities of existing
occupiers are maintained after development of the site.
2. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing. |
G18
Acland Street |
0.02 |
1 |
1. Consideration to be given to
the style, design, massing and materials of the dwelling
to ensure that it will be in keeping with the surrounding
area.
2. Suitable boundary treatment to ensure that the
amenities of the occupiers of any neighbouring properties
are unaffected. |
G19
Ropery Road |
0.05 |
3 |
1. Consideration to be given to
the style, design, massing and materials of the dwellings
to ensure that they will be in keeping with the surrounding
area. |
G21
Northolme |
0.76 |
23 |
1. Consideration to be given to
the style, design, massing and materials of the dwellings
to ensure that they will be in keeping with the surrounding
area.
2. Suitable boundary treatment to ensure that the
amenities of the occupiers of any neighbouring properties
are unaffected.
3. The provision of a suitable acoustic screen
and or screen planting on the north east elevation to
minimise the impact of the railway line on the site. |
G22
Bridge Street |
0.38 |
15 |
1. Suitable boundary treatment to
ensure that the amenities of the occupiers of the properties
will be unaffected by surrounding land uses. |
G23
Portland Terrace |
0.02 |
1 |
1. Consideration to be given to
the style, design, massing and materials of the dwelling
to ensure that it will be in keeping with the surrounding
area. |
G24
North Street |
0.09 |
5 |
1. Consideration to be given to
the style, design, massing and materials of the dwellings
due to their prominent corner location.
2. Frontage type development.
3. Consideration given to a suitable boundary treatment
given the visible location of the site. |
G25
Corringham Road |
2.22 |
60 |
1. Provision of a suitable boundary
treatment on the western and eastern boundary of the site
to protect the amenities of the occupiers from adjoining
land uses.
2. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing. |
G26
Church Street |
0.52 |
29 |
1. Particular regard to be given
to the style, design, massing and materials of the dwellings
due to the prominent location of this site on entering
the town.
2. Suitable boundary treatment and/or screen planting
on the northern elevation to screen the dwellings from
the existing petrol station and public house.
3. Removal of existing buildings from site prior
to the commencement of any work on site. |
G28
Lea Road |
0.14 |
6 |
1. Suitable screen landscaping to
rear of the site (south west elevation).
2. Prior to development a detailed Flood Risk Assessment
will be required, to demonstrate that the site is not
at significant risk from flooding and that any necessary
mitigation will not increase the risk of flooding elsewhere. |
G29
Lea Road |
0.22 |
5 |
1. Suitable screen landscaping to
the rear of the site (south west elevation). |
G31
Nelson Street |
0.64 |
26 |
1. Consideration should be given
to the style, design, massing and materials of the dwellings
to ensure that they will be in keeping with the surrounding
area.
2. Suitable boundary treatment to ensure that the
amenities of the occupiers of any neighbouring properties
are unaffected and the western boundary screened by landscaping.
3. Prior to development a detailed Flood Risk Assessment
will be required, to demonstrate that the site is not
at significant risk from flooding and that any necessary
mitigation will not increase the risk of flooding elsewhere. |
G(E)2
Heapham Road |
48.10 |
n/a |
1. A2, B1, B2 and B8 uses
2. Access from Heapham Road industrial area.
3. Consideration to be given to the design of roads
to reduce vehicle speeds.
4. Provision of a landscape buffer strip on the
north western boundary of the site to reduce the visual
impact of the proposal from the A631 (Thorndyke Way).
5. Provision of a suitable landscaping scheme on
the southern and eastern boundary to minimise the impact
of the proposal on the character and appearance of the
surrounding countryside.
6. Infrastructure improvements.
7. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing. |
G(E)3
Foxby Lane |
3.83 |
n/a |
1. A2 and B1 uses.
2. Access from Foxby Lane frontage.
3. Infrastructure improvements.
4. Provision of a landscape buffer strip on the
west and the north elevation bordering site G11 to ensure
that the use proposed has a minimal impact on the residential
amenities of the occupiers of the properties.
5. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing. |
G(M)1
Riverside |
2.17 |
150 |
1. A3, B1, B2, C1, C3, D1and D2
uses and open space provision (150 dwellings).
2. Conversion of existing properties where suitable.
3. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing.
4. Prior to development a detailed Flood Risk Assessment
will be required, to include a survey of the condition
of the flood defences and any works required to bring
the site up to an appropriate level of flood protection
for the expected lifetime of the development. The
assessment should also include any mitigation measures
required to demonstrate that these will not increase the
risk of flood elsewhere. |
G(M)3
Torr Street/ Beaumont Street |
0.80 |
14 |
1. A3, B1, C3 and D2 uses (14 dwellings).
2. Design/layout to take account of the potential
to provide clearer links between Tesco and the Town Centre.
3. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing.
4. The developer will be required to carry out
an assessment of flood defences to ensure that these area
to the 1:200 year standard for the lifetime of the development
(50 years). Any necessary improvements and maintenance
to be provided by the developer. The Flood Risk
Assessment to determine the extent and nature of residential
development. |
G(M)4
Britannia Works |
3.08 |
n/a |
1. A1, A3, B1, C1 and D1 uses and
open space/community use provision.
2. Conversion of existing buildings where possible.
3. High quality urban design led solution required.
4. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing. |
G(M)5
Carr Lane/Bridge Street |
4.06 |
100 |
1. Water basin marina and associated
housing (100 dwellings) with commercial and leisure uses.
2. Creation of riverside walkway.
3. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing.
4. The developer will be required to carry out
an assessment of flood defences to ensure that these are
to the 1:200 year standard for the lifetime of the development
(50 years). Any necessary improvements and maintenance
to be provided by the developer. The flood risk
assessment to determine the extent and nature of residential
development. |
G(M)6
Cross Street |
0.35 |
6 |
1. B1, C1, C2, C3, D1 and D2 uses
and open space/car parking provision (6 dwellings).
2. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing. |
GLENTWORTH
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Gh1
Elizabeth Close |
1.05 |
12 |
1. Access to be from Elizabeth Close.
2. Hedge boundary to Kexby Road to be retained and strengthened along with planting in sewage works separation zone. |
GRAYINGHAM
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Gr2
Main Street |
0.23 |
4 |
1. Agricultural activity to cease and agricultural buildings to be removed prior to the commencement of development on site.
2. Landscaping required on the northern and eastern boundaries.
3. Building materials, positioning and method of enclosure to the north and east sides of the site to be considered carefully to prevent any proposal from having a negative effect on the character and appearance of the area.
4. Single access from Main Street.
5. Hedging to be retained and enhanced along the Main Street frontage. |
GREAT LIMBER
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
GL2
Grasby Road |
0.38 |
3 |
1. Housing to meet a defined local need.
2. Design, layout and materials to reflect the character and appearance of the Conservation Area.
3. Retention of mature trees and hedgerows and new landscaping and planting on site boundaries.
4. No access onto the A18
5. Infrastructure improvements. |
GL3
High Street |
0.88 |
3 |
1. Housing to meet a defined local need.
2. Design, layout and materials to reflect the character and appearance of the Conservation Area.
3. Retention of mature trees and hedgerows and new landscaping and planting on site boundaries, including the respect of the features of the important frontage.
4. Single access point from the High Street and the retention of the lay-by.
5. Infrastructure improvements |
GL(E)1
Grasby Lane |
0.48 |
n/a |
6. B1 uses.
7. Design, layout and materials of development to reflect edge of Conservation Area location and setting of listed building to the north.
8. Existing site business uses to be incorporated/retained when new development takes place. |
HARPSWELL
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Hp(M)1
Harpswell |
0.70 |
To be agreed in an overall scheme |
1. Biomass Renewable Energy Demonstration Project with Conversion of Existing Buildings and Limited New Build into Live and Work Units.
2. The scale of the proposal should reflect the rural location and character of the settlement and the landscape setting with the development of live and work units linked to the success of the biomass renewable energy demonstration project.
3. Live and Work units to be provided with no separate residential units being created, all residential elements are to be tied to the employment activities provided.
4. The proposals primary purpose is to be a demonstration project for bio-mass energy.
5. All development is to reflect the rural character of the settlement with no open storage of materials and no creation of domestic gardens or curtilages on the site.
6. A Section 106 Planning Obligation will secure the above. |
HAWTHORN AVENUE (Cherry Willingham and Reepham)
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
HA1
Hawthorn Avenue |
1.64 |
38 |
1. Provision of dual access to provide a through road, one access directly off Hawthorn Avenue (not through haulage yard), second access gained from Hawthorn Road. |
HEMSWELL
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
H4
Weldon Road |
0.25 |
2 |
1. Landscaping to the southern and eastern sides of site required.
2. Method of enclosure of site to Weldon Road to be retained and enhanced.
3. Infrastructure improvements.
4. Water drainage rate from site to Hemswell Beck must not increase on development of the site. |
H5
Dawnhill Lane |
1.04 |
9 |
1. Retention of existing site hedgerows and landscape features as part of any development.
2. Existing stud farm accesses to be utilised for development as a first priority. Consideration to be given to other access options only if existing accesses are proven to be unsuitable.
3. Infrastructure improvements.
4. Water drainage rate from the site to Hemswell Beck must not increase on development of the site. |
HEMSWELL CLIFF
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
HC(E)1
North of A631 |
17.26 |
n/a |
1. A2, B1, B2 and B8 uses.
2. Only B1 uses to be located in close proximity to residential areas.
3. Buffer landscaping to be provided adjacent to residential area and through site to improve the visual amenity of the area.
4. Creation of cycle route on site separate from motorised traffic.
5. Foot and cycle access direct to neighbouring residential areas to be provided.
6. Infrastructure improvements particularly drainage and water supply. |
HC(M)1
Old Technical Park |
12.53 |
n/a |
1. A1, A2, A3, B1, B2, C2 and D2 uses.
2. Environmental improvements. |
KEELBY
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
K2
Stallingborough Road |
2.22 |
50 |
1. Landscape planting on the eastern and northern site boundary.
2. No individual frontage access onto Stallingborough Road.
3. Infrastructure improvements. |
K4
Stallingborough Road |
1.25 |
15 |
1. The development of this allocated site is dependent upon the provision of the adjoining recreational area which is to be developed in collaboration with the local community.
2. Development is to be carried out as an extension to the K2 allocation. |
KEXBY
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Kx5
High Street |
0.42 |
4 |
1. Landscaping to be provided along the northern and western boundaries.
2. Highway improvements. |
KNAITH PARK
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
KP1
Station Road |
1.02 |
17 |
1. Landscape screening on site boundaries with open countryside (south east and south west). Landscape screening of access drive where it adjoins existing curtilages.
2. Retention of existing boundary hedgerows.
3. Infrastructure improvements. |
LANGWORTH
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
L2
Off Scothern Lane |
0.69 |
4 |
1. Adequate access must be achieved.
2. Development to be linked to site L3. |
L3
Depot site |
1.05 |
20 |
1. No development to take place until adequate access is achieved including off-site sight lines.
2. Development to be linked to site L2. |
LAUGHTERTON
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
La1
Kettlethorpe Road |
1.01 |
15 |
1. Conversion of some existing farm buildings to dwellings or to ancillary uses such as garages or domestic storage.
2. Design and materials used in new buildings to match or blend in with existing farmhouse and farm buildings.
3. Retention of hedges and trees on site.
4. Landscaping treatment to north and eastern boundaries.
5. Single vehicular access from Kettlethorpe Lane on northern boundary.
6. Pedestrian and cycle access to footway on eastern side of the A1133 in south west corner of the site. |
LAUGHTON
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Ln2
Morton Road |
1.56 |
23 |
1. Access to be provided from Morton Road. If access and highway constraints allow, No. 20 Morton Road to be retained. If demolition of that property is required to allow access, a new two storey property, similar in style to No.20 Morton Road shall be implemented immediately to the east of the access road and north of Morton Road, in order to maintain character and enclosure.
2. Landscaped strip to be provided adjacent to housing on northern side of the site.
3. Existing site landscaping features to be retained.
4. Infrastructure improvements.
5. Consideration to be given to the design of roads on site to reduce vehicle speeds. |
LEGSBY
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Ly3
Church Farm |
0.32 |
2 |
1. Frontage of the site to the road to be enclosed by means of hedging retained where already in existence.
2. Existing footpath link to the church to be retained. |
LINCOLN FRINGE
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
LF2/LF3
Wolsey Way |
12.48 |
350 |
1. Wolsey Way to be completed before any development commences.
2. 35m buffer strip adjoining by-pass with tree planting and footpath links to other residential areas.
3. No development to the west of Megg House, area to remain open in broad character with landscape planting.
4. Green wedge to be kept linking King George V playing field to the open countryside. |
LF5
Wragby Road |
3.77 |
66 |
1. Provision for buffer zone of 35m with tree planting. |
LF6
Hawthorn Road |
3.82 |
70 |
1. Buffer zone at south end of site similar in extent to that required on adjacent land within Lincoln City . Buffer zone to contain landscaping and other measures, where appropriate, to offset the effects of actual and potential quarrying to the south. |
LINCOLN FRINGE
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
LF7
Nettleham Road |
5.50 |
65 |
1. The site to be developed for 65 dwellings, only in association with the development of the adjoining land within the City of Lincoln as part of a planned urban extension, focusing on the Nettleham Road ‘˜district mixed use centre.’
2. Development to accord with the principles of a masterplan (or equivalent) to be agreed by both interested local planning authorities.
3. Development to be phased to commence once an agreed proportion of the district mixed use centre extension has been completed.
4. A buffer strip alongside the A46 and an area at the eastern end of the site adjoining the roundabout to be identified for special treatment so as to maintain a soft edge and approach to Lincoln.
5. Earth bund with planting to be retained, and if necessary supplemented, to provide effective screening and noise protection and a varied edge to the built up area. |
Longer Term Development Option |
32.46 |
To be worked up through the Masterplan |
1. No development to take place prior to the construction of the Eastern By-pass.
2. Any development to follow the principles of any masterplan agreed for the Eastern Growth Corridor. |
LISSINGTON
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Li1
Wickenby Road |
0.91 |
5 |
1. Cessation of farm activity and removal of agricultural buildings prior to development commencing on site.
2. The brick part of the site frontage wall or side of the building shall be retained where it adds character to the appearance of the village.
3. Either a single access to serve all of the dwellings shall be created or a private driveway shall be created into the site with access to one dwelling directly off Wickenby Road .
4. The hedging along the Wickenby Road frontage shall be retained and improved with new planting where necessary.
5. Careful consideration of building design to take account of surrounding development. |
MARKET RASEN
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
MR3
Willingham Road |
7.48 |
150 |
1. Retention of hedgerows
and trees where possible.
2. Substantial landscape treatment along the western,
northern and eastern boundaries of the site.
3. Infrastructure improvements including drainage
and water supply.
4. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing. |
MR4
Gallamore Lane |
9.27 |
135 |
1. Single vehicular access
from Caistor Road and another single access into the site
from Gallamore Lane. Full development will require both
accesses and a road system linking both accesses within
the site.
2. Woodland on OS parcel 5000 and 5897 to be retained
on development
3. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing. |
MR5
Legsby Road |
2.89 |
82 |
1. Pedestrian access and cycle route
throughout to link with De Aston Field to the North and
public footpath no. 162.
2. Traffic calming measures aimed at reducing traffic
speeds to make the residential street safer for pedestrians
and cyclists.
3. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing.
4. No additional access to the site can be taken
from Lamas Lea Road.
5. Retain existing hedgerows and trees where possible.
6. Substantial landscaping to the southern
boundary. |
MR10
Caistor Road |
3.21 |
80 |
1. Vehicular access from Caistor
Road (B1202) south of the junction of the B1202 and A46.
Provision of a footpath at the eastern side of Caistor
Road in between the site entrance and the existing footpath
to the south.
2. Substantial landscaping to the northern and
eastern boundaries.
3. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing. |
MR11
Walesby Road |
0.72 |
20 |
1. Retain existing hedgerows and
trees on site where possible.
2. Substantial landscaped buffer zone along the
western boundary next to the railway line. |
MR16
Jameson Bridge Street |
0.06 |
2 |
1. Particular regard to be given
to the style, design and materials of the dwellings having
regards to their Conservation Area location. |
MR17
Willingham Road |
0.27 |
8 |
1. Infrastructure improvements
2. Access to be taken directly from Willingham
Road. |
MR(E)1
Gallamore Lane |
3.62 |
n/a |
1. A2, B1, B2 and B8 uses.
2. No open storage.
3. Vehicular access from existing industrial estate
to the east.
4. The developer will need to undertake an appropriate
transport assessment to determine whether highway safety
improvements will be required prior to the development
commencing.
5. Retain the maximum possible amount of existing
hedges and trees on site and reinforce landscaping on
the northern boundary.
6. Substantial landscaping treatment to the western
and southern boundaries. |
MR(M)3
Union Street |
0.21 |
9 |
1. A1, A2, C2 and C3 with open
space provision /community uses (9 dwellings). |
MR(M)4
Waterloo Street |
0.31 |
15 |
1. A1, A2, B1 and C3 together with
facilities for servicing retail properties on Queen Street
(15 dwellings). |
MR(M)5
Linwood Road |
3.02 |
5 |
1. A1, A3, C1, C3, D1 and D2 uses.
2. Transport interchange
3. Open space and visitor facilities (5 dwellings) |
MARTON
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Ma1
Trent Port Road |
0.22 |
3 |
1. Landscape planting on the southern and western site boundaries. |
Ma3
Stow Park Meadow |
0.57 |
6 |
1. Single storey development on the western half of the site to protect the appearance of hillside views.
2. Retain and supplement existing hedgerows and trees where possible.
3. Substantial landscape treatment on western and southern boundaries preferably linked with footpath no. 68.
4. Pedestrian access to footpath no. 68 on the southern boundary of the site.
5. Infrastructure improvements may be required, including drainage/water supply improvements. If land drainage improvements are necessary these should be dealt with before works on the dwellings commence. |
MIDDLE RASEN
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Mi5
Mill Lane |
0.89 |
17 |
1. Retention of existing trees and hedgerows on site.
2. Substantial landscape planting/treatment along the open southern and western site boundaries.
3. Infrastructure improvements. |
MORTON
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Mo5
Walkerith Road |
1.50 |
25 |
1. Landscape planting on open northern and western site boundaries and to provide separation between existing houses.
2. Single access point from the Walkerith Road frontage.
3. Infrastructure improvements. |
Mo6
North Street |
0.32 |
4 |
1. Landscape planting on eastern and northern site boundaries. |
Mo7
Walkerith Road |
2.75 |
32 |
1. Landscape planting on eastern site boundaries to provide separation from existing properties.
2. Retention of existing site trees/hedgerows where appropriate, including on the western site boundary. Further landscape planting along the open sections of the western site boundary.
3. Access from Walkerith Road frontage together with an emergency link to Walkerith Road if required. No vehicular access onto field lane.
4. Provision of pedestrian link to field lane.
5. Infrastructure improvements. |
NETTLEHAM
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
N(E)1
Deepdale Lane |
1.30 |
n/a |
1. B1, B2 and B8 uses
2. Tree planting on west, north and eastern boundaries.
3. Particular regard to the design of the proposed buildings. |
N(E)2
Lodge Lane |
0.77 |
n/a |
1. B1 use
2. Provision of landscaping to the south of the site.
3. Provision to be made for an adequate landscaped buffer zone between the site and the adjoining residential development to the north. |
NETTLETON
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Ne3
Moortown Road |
0.53 |
6 |
1. Frontage plots to be served by paired access on to Moortown Road.
2. Landscaping along southern boundary. |
Ne7
Normanby Road |
0.10 |
1 |
1. Removal of all site buildings and adjoining farm buildings prior to the commencement of works on site.
2. Retention of hedges wherever possible and new landscaping on the eastern site boundary.
3. High quality design, use of traditional vernacular materials in development. |
Ne8
Wood Farm |
1.64 |
35 |
1. Infrastructure improvements.
2. Access to be taken from Moortown Road.
3. Landscaping to the western boundary.
4. Cessation of farming activities prior to the commencement of development. |
NEWTON ON TRENT
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
NT1
High Street |
0.35 |
2 |
1. Frontage plots
2. Retain the existing hedgerow to the northern boundary and as many other hedgerows and trees as possible.
3. Substantial landscape treatment along northern and western boundary to reinforce existing. |
NORTH KELSEY
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
NK4
Cemetery Lane |
0.64 |
10 |
1. Existing trees/ hedgerows on site to be retained.
2. Access from Cemetery Lane .
3. Infrastructure improvements.
4. Landscape planting to protect the amenity of existing homes. |
OSGODBY
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Og2
Mill Lane |
0.31 |
5 |
1. Retention of hedgerow on western site boundary (road frontage).
2. Landscape planting on the eastern site boundary. |
Og(E)1
Main Street |
0.63 |
n/a |
1. B1, B2 and B8 uses.
2. Existing site landscape features to be retained and enhanced, particularly to the site frontage to Main Street.
3. Removal of redundant buildings especially those not capable of conversion.
4. Provision of a suitable method of enclosure between the site and dwellings to the east. |
PINGLEY CAMP
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
PC(M)1
Pingley Camp |
3.37 |
10 |
1. B1 and C3 uses. Low density housing (10 dwellings) |
SAXILBY
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
S5
Off St Andrew’s Drive |
0.67 |
28 |
1. Provision of footpath links to improve accessibility for pedestrians. |
S6
Highfield Road |
0.12 |
2 |
1. Infrastructure improvements.
2. Consideration will be given to highway safety issues in this area, particularly in relation to parking associated with the adjacent Health Centre and Library. Should the Highway Authority consider it necessary then part of this site should be utilised to provide off street parking for these community facilities to avoid exacerbating any highway safety issues. |
SAXILBY ENTERPRISE PARK
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
S(E)1
Saxilby Enterprise Park |
10.18 |
n/a |
1. B1, B2, and B8 uses
2. Junction improvements to the Skellingthorpe Road/A57 Trunk road will be required to serve this development and cater for the increased traffic using this junction. |
SCOTHERN
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Sc3
Northing Lane |
0.39 |
3 |
1. Landscaping on northern boundary.
2. Frontage plots only. |
SCOTTER
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Sr1
Gainsborough Road |
3.47 |
40 |
1. Retain existing boundary vegetation along frontage to Gainsborough Road and the western edge of the site.
2. Development should avoid overlooking existing residential property along Birchwood Avenue, Rooklands.
3. Infrastructure improvements. |
Sr3
Messingham Road |
2.14 |
54 |
1. Provision of landscape planting along the open north and west boundaries.
2. Provision of additional access point from Messingham Road or North Moor Road. Pedestrian links to both roads.
3. Infrastructure improvements. |
Sr(E)2
Manton Road |
0.77 |
n/a |
1. B1, B2 and B8 uses.
2. Provision of substantial landscape planting on all site boundaries.
3. Infrastructure improvements.
4. No open storage. |
SCOTTON
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Sn1
Northorpe Road |
0.25 |
2 |
1. Frontage plots.
2. Landscaping to be provided along the southern site edge.
3. Careful design of dwellings to reflect the character of this visible village edge location.
4. Provision of a suitable means of enclosure to Northorpe Road to be provided.
5. Infrastructure improvements.
6. Surface water run off shall be attenuated to ensure that the rate of flow into Scotton Beck should not increase on development. |
Sn4
Crapple Lane |
0.75 |
8 |
1. Existing agricultural activity on site to cease prior to the commencement of development.
2. Conversion and adaptation of farm buildings if appropriate. Other agricultural buildings to be removed.
3. Existing site landscape features to be retained. New and enhanced landscaping at the eastern end of the site.
4. Grouped access shall be provided, the number of individual accesses dependent on the requirements of the Highway Authority but so that widening or other improvements to Crapple Lane are not required.
5. Frontage features which add to the enclosed nature of Crapple Lane shall be retained and enhanced.
6. No frontage development.
7. New development to be sympathetic in design and layout to converted buildings on site.
8. Infrastructure improvements.
9. Surface water run off shall be attenuated to ensure that the rate of flow into Scotton Beck will not increase on development of the site. |
Sn5
Westgate |
1.29 |
10 |
1. Existing site landscape
features to be retained and enhanced with additional landscape
planting on the western and southern site boundaries.
2. Improvements to Laughton Road between site access
point and Westgate, depending on the requirements of the
highway authority.
3. Infrastructure improvements.
4. Consideration to the design of the roads to
reduce the speed of traffic.
5. Surface water run off shall be attenuated to
ensure that the rate of flow into Scotton Beck will not
increase on development of the site. |
Sn6
Eastgate |
0.20 |
1 |
1. Existing site boundary
features to be retained and enhanced.
2. Additional landscaping along the southern edge
of the site.
3. No more site boundary hedging to be removed
than is necessary to gain access.
4. Consideration given to the design of the proposal
to ensure that it is in keeping with the visible village
edge location of the site.
5. Surface water run off shall be attenuated to
ensure that the rate of flow into Scotton Beck will not
increase on development of the site. |
SNITTERBY
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Sb1
School Lane |
0.88 |
8 |
1. Provision of a landscaped buffer space around sewage pumping station
2. Landscape planting along eastern site boundary.
3. Infrastructure improvements. |
SOUTH KELSEY
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
SK4
Thornton Road |
1.10 |
20 |
1. Access from Thornton Road .
2. Substantial landscape planting on eastern site boundary and to protect amenity of existing houses.
3. Infrastructure improvements. |
SK8
Brigg Road |
1.56 |
11 |
1. Single access point from Thornton Road. No individual frontage access.
2. Substantial landscape planting on the western, southern and eastern site boundaries and a buffer between the Village Hall car park and the south west corner of the site.
3. Infrastructure improvements. |
SK9
Waddingham Road |
0.72 |
12 |
1. Cessation of farm activity on site prior to the houses being occupied.
2. Access from Waddingham Road only.
3. Landscape planting on open western site boundary to protect the amenities of existing houses.
4. Design, layout and materials of the development must have regard to the setting of St Mary’s Church.
5. Infrastructure improvements. |
SOUTHREY
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
So2
Ferry Road |
0.10 |
2 |
1. Low density development of 2 dwellings maximum.
2. Landscaping to be provided on western, southern and eastern boundaries.
3. Suitable boundary treatment to be provided on the western boundary to protect the residential amenities of the future occupiers from the pub and depot activities. |
STURTON BY STOW
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
SS(E)1
Tillbridge Road |
2.61 |
n/a |
1. B1, B2 and B8 uses.
2. Implementation of measures prior to any new development which will ensure that land drainage problems caused by development in the village are not exacerbated.
3. Landscaping to be provided on site edges and adjacent to Tillbridge Lane. |
SUDBROOKE
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Su2
Wragby Road |
0.06 |
2 |
1. Consideration to be given to the design, style and materials of the dwellings having regards to their prominent location on entering the settlement. |
SWALLOW
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Sw2
Caistor Road |
0.70 |
5 |
1. Landscape treatment to western site boundary.
2. Area of site to the south and the north-east of land drain to be planted with trees.
3. Infrastructure improvements. |
Sw3
Grimsby Road |
0.36 |
4 |
1. Frontage development.
2. Landscape treatment along northern site boundary. Buffer area to separate the site from the sewage works. |
TORKSEY
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
To(E)1
Main Street |
2.48 |
n/a |
1. B1 and B2 uses. B2 uses only on northern half of the site.
2. Access from existing adjacent employment operation.
3. Significant landscape and planting to be provided on southern boundary.
4. Prior to development a detailed Flood Risk Assessment will be required for this site to demonstrate that it is not at risk from flooding and that any mitigation measures required will not increase the risk of flooding elsewhere in the locality.
5. Assessment of contamination to be carried out prior to development. |
UPTON
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
U1
Lodge Lane |
0.31 |
7 |
1. Access from Lodge Lane. No access from Cade Lane.
2. Significant landscape planting to be provided on the open west and eastern boundaries of the site.
3. Infrastructure improvements. |
U(M)1
Church Lane |
0.94 |
1 |
1. Burial ground to be provided with open space.
2. One single dwelling to be located on the north-eastern boundary or the south-western boundary to be integrated into the existing built form of the settlement. |
WADDINGHAM
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Wa2
Snitterby road |
0.54 |
12 |
1. Access from Snitterby Road.
2. Landscape planting along the eastern and southern site boundaries.
3. Infrastructure improvements. |
WELTON
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
W6
Hackthorn Road |
1.35 |
27 |
1. Access from Hackthorn Road and Eastfield Lane. |
WILLOUGHTON
Site |
Area (ha) |
Proposed housing site capacity |
Site development requirements |
Wn1
Northfield Lane |
0.43 |
6 |
1. Existing and other site activity to cease prior to the commencement of development on site.
2. Large agricultural building at the southern end of the site to be removed.
3. Single vehicle access to be gained to the site from the north end.
4. Site to be enclosed to south and eastern sides by means of hedging.
5. Infrastructure improvements, particularly to water supply. |
Wn3
Templefield Road |
0.46 |
2 |
1. Single vehicular access to the site.
2. Hedging and planting fronting Templefield Road to be retained and enhanced. |
|